DNV GL China

Breadcrumbs

Probabilistic design of wind turbines

Joint Industry Project

联系我们

Andreas Bockstedte Andreas Bockstedte
Senior Engineer

For more information:

Renewables Certification
分享:
打印:
DROB wind turbines
Probabilistic design methods have been developed in search for a rational basis upon which to assess the reliability of structures operating in a rapidly changing industry. The aim of the project is to gain a deeper understanding of probabilistic design methods and to explore the potential of applying these methods for the optimised design and certification of wind turbines.
  • 发布日期:
  • 关键词: Energy, Renewables Certification, Joint Industry Project

The introduction of this Joint Industry Project will take place besides the international trade fair and European wind energy conference, WindEnergy Hamburg and WindEurope Summit.

Where:    Hamburg, Germany
Venue:    Messe Hamburg and CCH - Congress Center Hamburg
Room:    St. Petersburg (journey description will follow)
When:    Thursday, 29 September 2016 from 09:00 till 10:00

The project will produce two main documents:

  • An exclusive project report capturing the information and insight from the project will be made available to all project members.
  • In parallel a guidance document will be developed and published as a “Recommended Practice” (RP). The RP will provide an internationally acknowledged design standard for application of probabilistic design methods for wind turbines. The document will be subject to a wider industry stakeholder consultation and later become publicly available.
After this introduction you will have the opportunity to meet our expert at on our stand location in Hall B4.EG stand no. 324.
We are looking forward welcoming you at the WindEnergy Hamburg.