DNV GL China

Webinar: Occupied buildings risk assessment using Phast and Safeti

Phast - process hazard analysis software

Learn how to undertake an occupied buildings risk assessment

There will be two sessions to accommodate different time zones. Please choose between:

Session 1: 29 January, 09:00 - 10:00 CET
Session 2: 29 January, 16:00 - 17:00 CET

On March 23, 2005, a release of flammable liquid at the Texas City refinery led to an explosion and fire, causing the deaths of 15 workers in or near office trailers located close to the source of the accident.  

Major accidents such as this highlight the need for temporary and permanent buildings to be designed and located with consideration of process risk. In other words, these buildings should be assessed in an Occupied Buildings Risk Assessment (OBRA).

In this webinar, we will examine how to undertake an OBRA using Phast and Safeti – industry standard tools for consequence and risk analysis. 

This webinar will:

  • Provide background on guidance for the location and design of occupied buildings, such as API 752/753 and Chemical Industries Association
  • Describe the metrics that can be used to inform decision making about design and location of occupied buildings
  • Show how Phast and Safeti can be used as part of an Occupied Buildings Risk Assessment (OBRA)
  • Show the features in Phast and Safeti that enable such studies to be done efficiently

Presenter: James Pickles, Phast and Safeti Product Owner.

Phast Safeti OBRA_358x180

Register

Register for the webinar on 29 January 2020  

Register here

地点

WEBINAR

参会费用:

Free of charge

There will be two sessions to accommodate different time zones. Please choose between:

Session 1: 29 January, 09:00 - 10:00 CET
Session 2: 29 January, 16:00 - 17:00 CET

On March 23, 2005, a release of flammable liquid at the Texas City refinery led to an explosion and fire, causing the deaths of 15 workers in or near office trailers located close to the source of the accident.  

Major accidents such as this highlight the need for temporary and permanent buildings to be designed and located with consideration of process risk. In other words, these buildings should be assessed in an Occupied Buildings Risk Assessment (OBRA).

In this webinar, we will examine how to undertake an OBRA using Phast and Safeti – industry standard tools for consequence and risk analysis. 

This webinar will:

  • Provide background on guidance for the location and design of occupied buildings, such as API 752/753 and Chemical Industries Association
  • Describe the metrics that can be used to inform decision making about design and location of occupied buildings
  • Show how Phast and Safeti can be used as part of an Occupied Buildings Risk Assessment (OBRA)
  • Show the features in Phast and Safeti that enable such studies to be done efficiently

Presenter: James Pickles, Phast and Safeti Product Owner.

Phast Safeti OBRA_358x180