DNVGL.com

Breadcrumbs

Fixed offshore wind turbine seminar - Republic of Korea

How to do efficient coupled analyses for fixed offshore wind turbines using Sesam and Bladed

Contact us:

Register for fixed offshore wind turbine seminar!

Register here
SHARE:
PRINT:
Engineering analysis of fixed and floating OWT structures - Sesam software for offshore wind

Event Information

  • Where:

    Seoul, Republic of Korea

  • Venue:

    Seoul Global Center 9F (Jongno 38)

  • When:
    07 February 2018
    Add to calendar 2018/02/07 09:30 2018/02/07 17:30 Asia/Seoul Fixed offshore wind turbine seminar - Republic of Korea How to do efficient coupled analyses for fixed offshore wind turbines using Sesam and Bladed
    https://www.dnvgl.com/events/fixed-offshore-wind-turbine-seminar-republic-of-korea-107235
    This only adds the event to your calendar, please remember to register for this event.
    Seoul Global Center 9F (Jongno 38) false YYYY/MM/DD akeGphYOczrmtQTfhmEQ22349
  • Delegates Fee:

    Free of charge

  • Attend: Register here!

How to do efficient coupled analyses for fixed offshore wind turbines using a superelement approach 

The DNV GL software tools Sesam and Bladed form the complete, commercially available package that supports both a superelement and an integrated approach to designing and analysing offshore wind turbines. The interfaces between Sesam and Bladed have been verified and proven through a verification study. 

Seminar highlights:

  • Learn about the integrated and superelement analysis methods available when using Sesam and Bladed
  • Walk through the superelement approach workflow using Sesam and Bladed
  • Verification of the interfaces between Sesam and Bladed
  • Understand how a systems engineering based cost of energy model can help to optimise design
  • Learn how to maximise the value of your assets through continuous monitoring of operational turbines
  • Discover how the DNV GL Energy Advisory services can add value to your design process

Join us for this informative seminar where we will present and demonstrate examples of how Sesam and Bladed software can make your design, redesign and analysis processes more efficient.


This seminar is sponsored by Engineering Development Research Center (EDRC), Seoul National University

EDRC logo 180x60

Agenda

Fixed offshore wind turbine seminar with Sesam and Bladed - Seoul

  • Time
    Title/Description
    Speaker
  • 09:20 -09:45

    Registration and refreshment

    Speaker:
  • 09:45 -10:00

    DNVGL Digital Solutions for Offshore Wind Turbine including T&I and Asset integrity

    Speaker:

    Seok Pil Kwak

    Area Sales Manager for Design and Engineering, Korea and Japan

  • 10:00 -11:20

    Introduction to Bladed and Sesam (Part 1)

    • Superelement vs integrated analysis
    • Demonstration of analysis process (Superelement focus)
    • Modelling jacket and wind turbine

     

    Speaker:

    Laurens Alblas

    Product Manager Sesam for Fixed Offshore Wind Structures

    Robert Harries

    Senior Engineer in the Loads, Aero and Control department

  • 11:20 -11:40

    Coffee Break

    Speaker:
  • 11:40 -12:00

    Invited presentation

    Speaker:
  • 12:00 -13:00

    Introduction to Bladed and Sesam (Part 2)

    • Natural frequency analysis
    • Setting up load cases
    • FLS and ULS analysis
    • Model and result exchange
    • Sesam and Bladed interface verification study

    Speaker:
  • 13:00 -14:00

    Lunch and networking

    Speaker:
  • 14:00 -14:15

    Keynote Speech

    Speaker:
  • 14:15 -15:20

    Reducing the lifetime cost of energy through optimised design and advanced technology (Part 1)

    • Integrated design
    • Offshores structures services

    Speaker:

    David Victor Witcher

    Turbine Engineering Business Manager

    Robert Harries

    Senior Engineer in the Loads, Aero and Control department

  • 15:20 -15:40

    Coffee Break

    Speaker:
  • 15:40 -17:30

    Reducing the lifetime cost of energy through optimised design and advanced technology (Part 2)

    • Floating wind turbines
    • Turbine Design for minimal cost of energy
    • Monitoring of operational turbines

    Speaker:

    Laurens Alblas

    Product Manager Sesam for Fixed Offshore Wind Structures

    David Victor Witcher

    Turbine Engineering Business Manager

    Robert Harries

    Senior Engineer in the Loads, Aero and Control department