Join us for our workshop series to learn about fixed OWT installation using Sesam HydroD.

Join us for our next workshop series focused on fixed OWT installation using HydroD 6.0 and Sima 

The purpose of this workshop series is to go through the transportation and installation analysis of an OWT fixed structure.  This 2 session workshop will go through a transportation analysis using the all new HydroD 6.0 with Wadam and Sima.  

In the first class, you will begin with a barge and an OWT jacket structure will be analyzed to compute the hydrodynamics and motions analysis for a global installation analysis.  In the second class, the jacket will be offloaded and lowered into a floating position in the water column with the use of Sima software.  

  • Class 1 – A linear hydrodynamic transportation analysis will be conducted using the all new HydroD 6.0
  • Class 2 – A dual vessel lifting analysis will be performed to lift a fixed OWT jacket from the barge and into the water using SIMA 

There is a limit of 10 available computers for this work workshop, but we can accommodate more if bringing your own laptop. We will supply the licence for those bringing their laptop.  If there is a high interest in this class it will be offered again at the DNVGL office or if there is enough interest within a company we can do the event at your offices. 

To register simply click the register button and select the dates you would like to attend.  Lunch will be provided at noon. 

Select your date

Register

Register

Select your date  

Register here

Where:

Houston, TX, USA

DNV GL Katy Office 1400 Ravello Dr, Katy TX 77449

See map

When:

08 November - 15 November 2019

Add to calendar 2019/11/08 12:30 2019/11/15 16:30 America/Chicago Workshop Series: Fixed OWT Installation using HydroD 6.0 and Sima Join us for our workshop series to learn about fixed OWT installation using Sesam HydroD.
https://www.dnvgl.com/events/workshop-series-fixed-owt-installation-using-hydrod-6-0-and-sima-158868
This only adds the event to your calendar, please remember to register for this event.
DNV GL Katy Office 1400 Ravello Dr, Katy TX 77449 false YYYY/MM/DD akeGphYOczrmtQTfhmEQ22349
Agenda

Delegates Fee:

Free of charge

Join us for our next workshop series focused on fixed OWT installation using HydroD 6.0 and Sima 

The purpose of this workshop series is to go through the transportation and installation analysis of an OWT fixed structure.  This 2 session workshop will go through a transportation analysis using the all new HydroD 6.0 with Wadam and Sima.  

In the first class, you will begin with a barge and an OWT jacket structure will be analyzed to compute the hydrodynamics and motions analysis for a global installation analysis.  In the second class, the jacket will be offloaded and lowered into a floating position in the water column with the use of Sima software.  

  • Class 1 – A linear hydrodynamic transportation analysis will be conducted using the all new HydroD 6.0
  • Class 2 – A dual vessel lifting analysis will be performed to lift a fixed OWT jacket from the barge and into the water using SIMA 

There is a limit of 10 available computers for this work workshop, but we can accommodate more if bringing your own laptop. We will supply the licence for those bringing their laptop.  If there is a high interest in this class it will be offered again at the DNVGL office or if there is enough interest within a company we can do the event at your offices. 

To register simply click the register button and select the dates you would like to attend.  Lunch will be provided at noon. 

Agenda

Topics

Part 1

November 8

 

Hydrodynamic transportation analysis

Speaker

Chris Kubes

Senior Engineer

Part 2

November 15

 

Dual vessel lifting analysis

Speaker

Chris Kubes

Senior Engineer