Casualty of overboard valves - learning from a recent event

A leaking overboard discharge valve for cooling water contributed to a critical situation: water entered the vessel’s engine room and caused a blackout while it was operating in rough seas. Easy and regular maintenance routines by crew could have prevented the incident. This news focuses on consequences of casualties of overboard valves and what measures may prevent similar incidents.
  • Published:
  • Author:
  • Keywords: Casualty information, Maritime
TecReg 22 - Valve
 TecReg 22 - hole

Relevant for ship owners and managers.

Course of events

A leaking overboard non-return discharge valve resulted in seawater entering the engine room of a vessel operating in rough seas. The cooling water caused a blackout and the engine room began to flood, leading to a critical situation for the vessel and the crew. As a temporary measure, the leaking overboard valve was isolated and the vessel towed to port for repairs. During the damage survey, the bottom of the valve was found to be heavily corroded and holed. 

The top of the valve, however, appeared normal. Leaking overboard valves can lead to water entering the engine room. In severe cases, where the valve completely gives way, seawater can directly enter the engine room, causing rapid flooding.

Lessons learned and recommendations

Inspection of the valve seating, by partly opening of the valve, would not reveal the wastage in the bottom without fully dismantling the valve. However, inspection of the bottom part of the valve by using a hammer and visual inspection, e.g. a mirror, could have revealed deterioration of the valve body without being dismantled.

All sea valves, including scuppers and sanitary discharges, are to be thoroughly examined and fully opened at the time of class survey involving bottom surveys in dry dock. It is strongly recommended that the sea valves are overhauled at the same time. The condition of the valve body can be difficult to assess, but there are some easy regular inspection checks, when implemented in the maintenance plan on board, that help evaluate the condition of the valves:

  • In addition to a visual inspection of the body, a hammer test can be performed to evaluate thinning and corrosion. (Note: NDT of valve bodies are usually not a good option since the bodies are cast and usually have minor internal flaws even in a new condition.) 
  • Always check the bottom of the valve. 
  • If rubber lining has been provided in the valves, check that the lining is intact. If lining is partly peeled off, concentrated local corrosion may occur. Examine the fastening of the valves to the hull. 
  • If the body cannot be fully visual surveyed in situ, this is also an indication that the valve should be fully dismantled, since most likely no one is looking at it in service. All the more reason for a stringent examination at 5-year intervals. 
  • Please note there may be external corrosion as well as internal pitting / erosion at the same spot. A mirror or camera may be helpful tools. 
  • Systems in which heated seawater is passing may corrode more rapidly.

The costs of the proper examination/overhaul/replacement of a valve are minor compared to the cost for replacing a broken valve in service with unscheduled repairs and disrupted service. Upon reassembly, the valves should be tested to confirm satisfactory operation of the valves and their actuating mechanism, full closing of the valve and tightness of the valve when fully seated (ref. IACS Rec.144).

References

DNV GL Rules for Classification: RU-SHIP-Pt.7 Ch.1 Sec.5 1.1.2. Bottom survey

 

Contact

For customers: DATE – Direct Access to Technical Experts via My Services on Veracity.
Otherwise, please use our office locator to find the nearest DNV GL maritime office.

 

21 May 2019

2020 Sulphur update - outcome of the MEPC 74

The 74th session of the Marine Environment Protection Committee (MEPC 74) was held at IMO in London on 13–17 May 2019. This was the last MEPC meeting before the 0.50% global sulphur limit takes effect on 1 January 2020, and the focus was on the implementation and completion of guidelines to help stakeholders prepare and ensure consistent implementation. We strongly recommend stakeholders to prepare in due course and update plans according to the latest IMO guidance. This statutory news contains a summary of sulphur-related resolutions and circulars adopted at MEPC 74.

  • Maritime
01 April 2019

Survey by remote inspection techniques - use of approved service suppliers

The use of remote inspection techniques (RIT) is increasing. Today, drones, climbers, or robot arms, can be used as an alternative to close-up surveys in both the DNV GL rules and IACS Unified Requirements. RIT may significantly reduce the survey time and costs, while improving the safety of surveyors and the owner’s personnel. From 1 January 2019, DNV GL has approved the use of service suppliers for RIT. This technical news explains how RIT can be used and how suppliers can achieve DNV GL approval.

  • Maritime
View all