Power and renewables

Final Project Report

Australian battery standard

Development of a proposed performance standard for a battery storage system connected to a domestic/small commercial solar PV system

Request a copy

Fill out the form below to receive a free copy by email

(optional)
(optional)

Report

Final Project Report

ABPS Final project report

About:

Development of a proposed performance standard for a battery storage system connected to a domestic/small commercial solar PV system

Report

Final Project Report

About:

Development of a proposed performance standard for a battery storage system connected to a domestic/small commercial solar PV system

ABPS Final project report

Request a copy

Fill out the form below to receive a free copy by email

(optional)
(optional)

A Project Consortium consisting of DNV GL, the Commonwealth Scientific and Industrial Research Organisation (CSIRO), Smart Energy Council (SEC) and Deakin University was established to develop a proposed performance Standard for battery storage equipment (BSE - alternatively known as battery energy storage equipment) connected to residential and small-scale commercial solar photovoltaic (PV) systems. This proposed performance Standard is currently referred to as the Australian Battery Performance Standard (ABPS).
Report Number: PP198127-AUME-MS05-TEC-05-R-01-A

Report

Final Project Report

ABPS Final project report

About:

Development of a proposed performance standard for a battery storage system connected to a domestic/small commercial solar PV system