Pioneering Transportation and Installation Techniques for Floating Wind Foundations

Joint Industry Project

This Joint Industry Project (JIP) is set to gather input and insights from industry collaborators in addressing supply chain challenges.

Background

Offshore wind energy is expanding into deeper waters, necessitating the uptake of floating foundations in the industry. Along with Floating Offshore Wind (FOW) farms’ forecasted growth rate, the number and size of the Floating Offshore Wind Turbine (FOWT) foundations will increase significantly.

Challenge

Based on feedback, information and studies related toTransportation & Installation T&I) or FOWT foundations are limited. Coupled with the constraints of vessel capacity and availability, theT&I demand will be challenging to fulfil. As a result, to improve the efficiency of T&I for FOWT foundations has been identified as key bottleneck to tackle in the industry.

Objectives

  • Gathers industry insights to tackle supply chain challenges
  • Improve efficiency of T&I for FOWT foundations, reducing costs
  • Proposing guidelines that enhance vessel capacity and recommend key foundation design parameters

Benefit for participant

FOWT project interactions

  • Direct influence and involvement in the design requirements for T&I of FOWT foundations
  • Obtain insights on the current trend of vessels and FOWT foundations
  • Obtain early knowledge on what to expect of future FOWT foundations and vessel design requirements
  • Gain insights into the most cost-efficient methods for T&I of FOWT foundations.

Approach

A three-phased study to ensure its relevance to the market and provide value to the stakeholders.

FOWT project phases

Activities

While the details of the activities are subject to further discussion and finalization, a preliminary task breakdown is provided below.

Phase I

  • Perform market analysis to provide insights and forecast on FOW foundation demand, vessel capacity and availability, yard capabilities etc.
  • Conduct literature review of FOW farm T&I methodologies, including technologies that are readily available and innovations under development
  • Propose potential FOWT foundation T&I strategies and select the most valuable ones for further study in Phase II.

Phase II

This phase dives deep into the operation feasibility and the associated cost at each stage of the foundation T&I process and aims to provide insights that help stakeholders make more informed decisions.

Topics to be covered:

  • T&I planning, including vessel & equipment selection, and deck arrangement study
  • Loadout and transportation study, including dry transportation, wet tows and modularized transportation
  • Foundation installation, including traditional, modular or other novel methods
  • Impact from turbine integration methods
  • Floating assembly/fabrication concept.

Phase II will also contribute to DNV’s Recommended Practice.

Phase III (optional)

If it’s of interest, Phase III can be activated to further explore opportunities for a more efficient FOW farm T&I approach through combining the T&I operations of multiple components, e.g. anchor and mooring, foundation, turbine etc.

Deliverables

  • Study reports and technical memos as agreed with industry partners
  • DNV Recommended Practice (RP)

Project partners and tentative fees

  • DNV (lead)
  • FOW developer: USD 100k
  • T&I contractors: USD 80k
  • Designer for FOWT foundations: USD 60k

All fees are payable over 2 financial years. Participants can arrange for flexibility in the payment schedule through mutual agreement.

Contact us

Jun An Lim

Jun An Lim

Project Manager

Yong Andy Wang

Yong Andy Wang

T&I Engineering Business Lead

Join the JIP!

EXPRESS YOUR INTEREST DOWNLOAD THE BROCHURE

Other Joint Industry Projects

 

Joint Industry Projects homepage

Go back to the Joint Industry Projects homepage to see the newest projects per category

 

Joint Industry Projects per category

Go to the Joint Industry Projects category overview page to see all projects per category